There will be a planned short outage this Friday (24th Nov), at our datacenter.The work will be carried out on Friday 24th November, 2017 during the window 07:00am - 8:00am.We are installing new uplinks to our core firewalls for increased reliability and performance.As always, we will keep any downtime to a minimum, and are prepared to roll back if the changes will not be completed within the scheduled window.
David Cunningham
There will be a planned short outage this Friday (24th Nov), at our datacenter.
The work will be carried out on Friday 24th November, 2017 during the window 07:00am - 8:00am.
We are installing new uplinks to our core firewalls for increased reliability and performance.
As always, we will keep any downtime to a minimum, and are prepared to roll back if the changes will not be completed within the scheduled window.